Apple Store – Third Street Promenade
Location: Santa Monica, CA
Architect: Bohlin Cywinski Jackson
General Contractor: Pepper Construction
Facade Engineer: Larson Engineering
During the construction of the Apple flagship store in Santa Monica, Cleveland Marble performed the installation of 15,000 SF of Exterior and Interior Marble Wall Cladding. The marble panels were mechanically anchored using the “Fischer Aluminum Anchoring System” including Fischer back anchor, Fischer aluminum clip, Fischer horizontal and vertical grit system. The marble wall cladding installation was performed under a demanding construction schedule and strict installation tolerances. The work was completed in six weeks. The installation tolerances exceeded Industry Standards.
Valentino USA
Location: San Francisco, CA
Architect: Brand + Allen Architects
General Contractor: Bowers Construction
Valentino Store in San Francisco was a unique project that involved the installation of approximately 16,000 square feet of precast terrazzo panels and natural stone. Cleveland Marble was chosen because of project’s complexity and the need for an expedited schedule. The precast terrazzo panels were used in a variety of applications including flooring, wall cladding, ceiling, stairs, door cladding, window jambs, and portal jambs. The majority of terrazzo panels were very large, some as large as 9’-0” X 4’-0”, weighing around 800 lbs. What made the installation particularly complex, is the requirement for “zero” joints. The tolerances of the installation were close to 1mm. The flooring was installed over Ditra Anti-Fracture membrane over mortar setting bed. The marble flooring was installed in book-matched fashion. The granite was used in the bathrooms and as part of exterior paving.
Apple Store – Stanford
Location: Palo Alto, CA
Owner: Apple
Architect: Bohlin Cywinski Jackson
General Contractor: Pepper Construction
Facade Engineer: Larson Engineering
The Apple Store in Stanford involved the installation of 11,000 SF of Exterior and Interior Marble Wall Cladding. The marble panels were mechanically anchored using the “Fischer Aluminum Anchoring System” including Fischer back anchor, Fischer aluminum clip, Fischer horizontal and vertical grit system. The plaza work consisted of installing large precast concrete planters and replacing stone paving bands. Cleveland Marble matched the existing paving bands with new stone. The new stone was fabricated onsite and installed in a similar pattern of the original pavers. The marble wall cladding and plaza installation was performed under a demanding construction schedule and strict installation tolerances. The installation tolerances and quality of workmanship exceeded Industry Standards.
Macy’s Union Square
Location: San Francisco, CA
Architect: PEM Architects
General Contractor: Swinerton Builders
More Retail Projects:
Apple – Broadway Plaza
Location: Walnut Creek, CA
General Contractor: Plant Construction
Buffums, Fashion Island
Location: Newport Beach, CA
Architect: Lang Lampert
General Contractor: Turner Construction
Channel Boating Center
Location: Ventura, CA
General Contractor: Cleveland Marble LP
JCPenney Company
Location: Northridge, CA
Architect: J Howard Nudell
General Contractor: Whiting Turner
LAX Star Alliance Lounge
Location: Los Angeles, CA
Architect: Gensler
General Contractor: Hensel Phelps Construction
Mistral Restaurant
Location: Los Angeles, CA
Architect: Jeff Cooper Architects
General Contractor: Synergetics, Inc.
Neiman Marcus
Location: San Francisco, CA
Architect: Diedrich
General Contractor: Swinerton Builders
Plaza at West Covina
Location: West Covina, CA
Architect: RTKL Associates
General Contractor: Whiting Turner
Waikiki Beach Walk
Location: Honolulu, Hawaii
Architect: Altoon + Porter
General Contractor: Charles Pankow Builders
Waikiki Shopping Plaza
Location: Honolulu, Hawaii
Architect: MGA Architecture
General Contractor: PCL Construction